{"id":10672,"date":"2024-12-11T14:25:41","date_gmt":"2024-12-11T13:25:41","guid":{"rendered":"https:\/\/extali.eu\/docs\/3-krankenhausleitung\/3-7-qm-koordination\/3-7-07-einfuehrung-eines-qm-systems\/"},"modified":"2025-08-07T11:44:05","modified_gmt":"2025-08-07T09:44:05","slug":"3-7-07-introduction-of-a-qm-system","status":"publish","type":"docs","link":"https:\/\/gutehospitalpraxis.de\/en\/handbuch\/3-krankenhausleitung\/3-7-qm-koordination\/3-7-07-einfuehrung-eines-qm-systems\/","title":{"rendered":"3.7.07 Introduction of a QM system"},"content":{"rendered":"<h2 class=\"wp-block-heading\" id=\"ziel_und_zweck\">Goal and purpose<\/h2>\n\n\n\n<p>The management draws up a quality development plan in which time-limited, project-like organised measures are planned to achieve sub-goals. The projects are assigned to persons or groups of persons. Time requirements and the use of additional resources must be planned. In practice, partial aspects of a problem are often dealt with in several project groups, which must be coordinated.<\/p>\n\n\n\n<p>The QM group maintains a general project plan and monitors the milestones.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"anwendungsbereich\">Area of application<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"beschreibung\">Description of the<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"dokumentation\">Documentation<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"ressourcen\">Resources<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"zustaendigkeit_und_qualifikation\">Responsibility and qualification<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"hinweise_und_anmerkungen\">Notes and comments<\/h2>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"mitgeltende_unterlagen\">Applicable documents<\/h2>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"literatur\">Literature<\/h4>\n\n\n\n<h4 class=\"wp-block-heading\" id=\"begriffe\">Terms<\/h4>\n\n\n\n<p><\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"anlagen\">Attachments<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Processing status Vas<\/li>\n\n\n\n<li>Working group plan<\/li>\n\n\n\n<li>Problem memory<\/li>\n\n\n\n<li>Timetable for meetings<\/li>\n\n\n\n<li>Project participants by team<\/li>\n\n\n\n<li>GANTT diagram of the projects<\/li>\n<\/ol>","protected":false},"excerpt":{"rendered":"<p>Ziel und Zweck Die Leitung stellt einen Qualit\u00e4tsentwicklungsplan auf, in dem zeitlich begrenzte, projektartig organisierte Ma\u00dfnahmen zur Erreichung von Teilzielen geplant werden. Die Projekte werden Personen oder Personengruppen zugeordnet. Zeitbedarf und Einsatz weiterer Ressourcen sind zu planen. In der Praxis werden Teilaspekte eines Problems h\u00e4ufig in mehreren Projektgruppen bearbeitet, die koordiniert werden m\u00fcssen. Die QM-Gruppe [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":10648,"menu_order":155,"comment_status":"open","ping_status":"closed","template":"","doc_tag":[],"doc_badge":[],"class_list":["post-10672","docs","type-docs","status-publish","hentry","no-post-thumbnail"],"acf":[],"author_avatar":"https:\/\/secure.gravatar.com\/avatar\/c6b2616140d9fcd6a1c5d6d2ebbf43422308c9322c032ef03f88ec3235855dcf?s=96&d=mm&r=g","author_name":"admin","_links":{"self":[{"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/docs\/10672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/docs"}],"about":[{"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/types\/docs"}],"author":[{"embeddable":true,"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/comments?post=10672"}],"version-history":[{"count":1,"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/docs\/10672\/revisions"}],"predecessor-version":[{"id":14819,"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/docs\/10672\/revisions\/14819"}],"up":[{"embeddable":true,"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/docs\/10648"}],"wp:attachment":[{"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/media?parent=10672"}],"wp:term":[{"taxonomy":"doc_tag","embeddable":true,"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/doc_tag?post=10672"},{"taxonomy":"doc_badge","embeddable":true,"href":"https:\/\/gutehospitalpraxis.de\/en\/wp-json\/wp\/v2\/doc_badge?post=10672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}